• Home
  • Software
  • Wi-Fi
  • Videos
  • About US
  • Contact Us
  • Downloads

Technology at your finger tips

  • Home
  • Privacy Policy
  • Terms and Conditions
  • Disclaimers
  • Contact Us
> Home » TP-Link CPE210 2.4Ghz Outdoor Device Repeater Mode Configuration

TP-Link CPE210 2.4Ghz Outdoor Device Repeater Mode Configuration

June 29, 2018 by admin

TP-Link CPE210 2.4Ghz Outdoor Device Repeater Mode Configuration

I already posted a user manual for TP-Link CPE210 Access Point mode configuration. Now I will show how to configure TP-Link CPE210 2.4Ghz Outdoor Device Repeater Mode Configuration to extend your existing weak wifi signal. As in the last post already describe basic hardware and software specification of CPE210 device.  TP-Link CPE210 support multi-mode so in this post, I have cover Configuration in repeater mode or Range extender mode. Tp-link Pharos cpe210 is an outdoor device your best option for outdoor wifi range extender for the campus, hotel, swimming pool area, park area, and any other outdoor location.

  •  How to Connect Any Wi-Fi without Password from Mobile?

TP-Link CPE210 and Binatone C200 both are the same devices with only logo difference. So if you are looking for a manual how to configure Binatone C200 as wireless repeater mode than use this manual for the same. TP-link cpe210 device can be extended your weak signal strength up to 100% in every area of your home and office where main Wifi signal can’t reach.

After configuration of CPE210 as the repeater mode second important step is the placement of the Range extender device to boost wifi signal everywhere. So always use the centralized location from where main internet AP and other areas of equal distance.  Now enjoy the configuration manual for tp link pharos cpe210 as range extender to boost your internet speed and connectivity every corner.

  • TP-Link CPE220/CPE210 Wireless Access Point Configuration First time
  • The Best Way to Boost Your Wi-Fi Speed Up to 10x  [Tricks]

TP-Link CPE210 High power CPE device Connection diagram

Connect CPE210 Lan 0 port with PoE adapter PoE Port. Now Poe Adapter LAN port to PC/Laptop LAN port and power on Adapter as shown below image.

Always use PoE power adaptor comes with the device.

TPLink cpe210 outdoor wifi range extender setup

TPLink CPE210/CPE220 2.4Ghz Device Login First time

To login the device, you should know the default IP address and username password. You can get the default setting details backside sticker of the device.

TP-Link CPE210/CPE220 Default IP – 192.168.l.254  

Default username / password: admin/admin

Binatone C200 also the same configuration as CPE210 so for Binatone C200 default IP will be 192.168.10.1    Login username password – admin/admin

 

Use Default IP series IP Address in your PC/Laptop Lan.

EXP- 192.168.1.10 (use in PC/Laptop LAN)

  • How To Setup and Configure New Wi-Fi Router for your Home
  • Protect Network and Wireless Devices from Lighting and Thundering
  • The 15 Best Wireless Range Extenders to Boost WiFi signal [Updated]

 

Open the browser and type default IP and hit enter.

  1. Username/password- admin/admin ( change language as per your country)
  2. I agree to these terms of user- check this option
  3. Click Login button

how to extend wifi range outside with tplink cpe 210

TP-Link CPE220/CPE210 Password Change

  1. New userame – you can set the new username

New password – type new password

Confirm password- type new password again

2: Press the finish button to save settings and login to the device.

binatone c500 wireless cpe configuraion

 

TP Link CPE210 Repeater Mode Configuration

After login first changes the CPE210 operation mode Repeater.

Click top Operation Mode option and choose the Repeater mode from the list.

tp link cpe configuration for range extendar

 

Confirm Repeater mode change

Are you sure to switch the operation mode to Repeater – press yes button?

How to Configure the Repeater Mode on the Pharos device?

You will see the green color notification to save changes. Press save changes to apply settings.TP-Link CPE210 2.4 GHz 300 Mbps 9 dBi High Power Outdoor CPE

Now your CPE210 in Repeater mode.

TPLink CPE210 Connect to Access Point in Repeater mode

After change repeater mode you have to join the existing Access point network to repeat your wifi signal and work TP-Link CPE210 as the range extender.

  • Go to Wireless Tab
  • Region- select your country here

Mode- keep with 802.11 b/g/n

Channel Width- 20/40MHz

Max TX rate – MCS15-270/300

3:- Click  “survey” button to scan your Main WiFi name.

tp link cpe point to point configuration

 

Select your Main WiFi name from list and press Lock AP.

Lock AP will fix the repeater device to connected always with same AP if more than one Access point running with same WiFi name Password.

Download TP-Link CPE510 AREDN Firmware 3.16.1.0 SysUpgrade

  1. Lock to AP will auto selected when we choose during AP selection on the survey page.
  2. PSK Password- type your Main AP password in this box
  3. Apply settings to join CPE210 repeater to your main WiFi network

Installing Firmware on TP-Link CPE210/220/510/520

Click Save Changes to  reboot the device to join the wifi.

TP-Link CPE210 2.4 GHz 300 Mbps 9 dBi High Power Outdoor CPE

TP-Link CPE210 Repeater Mode Connected status

After rebooting the CPE210 device you can see the repeater connection status and signal strength on the status page.

In Status option, you can see Mac address of Host AP

SSID name

And Connected Station to Repeater device.

Default settings of the TP-LINK CPE510 cpe210

This is the simple steps for TP-Link CPE210 2.4Ghz Outdoor Device Repeater Mode Configuration with the Non-TP-link Access point. Repeater mode also called range extender so you can be extended your weak wifi signal to every corner of your home and office up to 100%. If you have any question about this configuration steps please comments of contacting us with mail.

 

Related Post 

  • TP-Link Deco M5 Mesh WiFi System Setup and Configuration (with Picture)
  • TP-Link TL-WA850RE Universal Repeater Setup and Positioning in Home
  • How to use WhatsApp without Phone Number with Tricks
  • How to Recover Deleted Photos and Videos from Memory Card

 

Buy TP Link CPE210 @ 2000 Only UP to 30% Off 

Video – TP-Link CPE210 2.4Ghz Outdoor Device Repeater Mode Configuration

Filed Under: CPE210/CPE220, TP-Link Tagged With: how to setup tp-link cpe210 on mac, tp-link cpe210 bridge setup, tp-link cpe210 client mode, tp-link cpe210 manual, tp-link cpe210 modes, tp-link cpe210 repeater range, tp-link cpe210 setup, tp-link cpe210 setup ap router

Recent Posts

  • Tenda AC10 AC1200 Bandwidth Control Configurations
  • How to Set Internet Speed Limit per IP in Mikrotik from Winbox
  • Top 5 Best Alternate Open Source Firmware for Your Routers
  • How to Connect Any Wi-Fi without Password from Mobile?
  • Best Free tools for image Watermark remover online and offline

Post by Month

  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • January 2016
  • August 2015
  • Home
  • Privacy Policy
  • Terms and Conditions
  • Disclaimers
  • Contact Us

Recent Posts

  • Tenda AC10 AC1200 Bandwidth Control Configurations
  • How to Set Internet Speed Limit per IP in Mikrotik from Winbox
  • Top 5 Best Alternate Open Source Firmware for Your Routers
  • How to Connect Any Wi-Fi without Password from Mobile?
  • Best Free tools for image Watermark remover online and offline

Copyright © 2022 & Powered By Genesis Framework